REASONS THIS STOCK COULD SOAR WHEN OIL PRICES SPIKE 50 - 100%

  • The company was founded by a former Exxon Mobil president responsible for 300,000 barrels of production a day (BOPD).
  • Management has invested over $1.5 MILLION in establishing the corporate structure, refining acquisition parameters and developing the current deal pipeline.
  • Current production averages 1133 barrels of oil per month (BOPM) representing 950,000 BO proved / probable reserves. This project is estimated to do 3400 BOPM after rework.
  • Proven and probable (2P) reserves associated with their Louisiana assets have a discounted present value (PV10) of $41,245,950 as of a March 1, 2011 reserve summary prepared by management, indicating attractive potential for growth.
  • Closed bridge financing for $150,000 and went public in 2011.
  • Plans to acquire over 1,500 acres with over 59 shut-in wells and 30 producing wells with 40 BOPD of current production, which will do 200 BOPD with minimal rework representing 2.1 MILLION barrels of proven reserves. A preliminary agreement has already been secured.
  • Plans to acquire and develop $200 MILLION in proven reserves.

Friday, September 30, 2011

American Petro Hunter Spuds Second Horizontal Well at North Oklahoma Project


SCOTTSDALE, AZ--(Marketwire -09/20/11)- American Petro-Hunter, Inc. (OTC.BB: AAPH.OB - News) ("American Petro-Hunter" or the "Company") today is pleased to announce the commencement of drilling at the NOW-2H horizontal oil well at the Company's North Oklahoma Mississippi Project. The drill rig has arrived onsite and spud activity commenced immediately.
As previously reported, the NOW-2H horizontal well is a direct 160 acre offset to, and ½ mile from, the producing NOM-1H. Once the Mississippi formation reservoir is reached vertically, the subsequent directional drilling will involve a 1,600-foot lateral leg drilled directly along the over 100-foot-thick limestone of the Mississippi formation pay zone.
Drilling should take between 15-18 days to reach total depth (T.D.), after which the Company confidently anticipates a rapid program to complete the well. The current objective is to have the NOW-2H pumping to the existing tank battery and gas pipeline by the end of October.
Company President Robert McIntosh states, "The NOW2-H well is the second of 11 wells to be drilled in the flourishing North Oklahoma Mississippi Lime Play which is rapidly becoming one of the premier oilfields in the country. With literally 100s of horizontal wells drilled and already producing, reservoir development in this region of the mid-continent is moving forward and creating news virtually every day." Mr. McIntosh continues, "American Petro-Hunter enjoys an enviable position with access to some of the best leases in the entire play and the Company is committed to an aggressive drilling schedule with plans to start a new well every 60 days so that we can maximize net production as quickly as possible."

No comments:

Post a Comment